Big Bertha: How a Massive Tunnel Boring Machine Dug a Highway Under Seattle

$18.99

11 in stock

Refresh Stock Level
Information

Information

Shipping
We currently offer free shipping on all orders over $100. Standard media mail shipping is $7.50 plus $1 for each additional book. Electronics are $35 shipping on all items.

Books
We get our books from a national distributor and although we strive to present up to date stock counts, stock constantly fluctuates. We perform a stock check when you add your book to the cart to ensure that it is available for shipping from the distributor. You can also check stock status by clicking the refresh stock link on the product page for the most up to date stock at the distributor. If an item is on backorder, you may place an order and we will update you on the estimated ship date as soon as we can confirm with the distributor.

Return & exchange
If you are not satisfied with your purchase you can return it to us within 14 days for an exchange or refund. More info.

Assistance
Can’t find what you’re looking for? We have access to over 13 million titles, reach out and see if we can help!

Contact us on (575) 322-6867, or email us at business@rabsbooks.com.

Specifications
Weight 0.75 lbs
Dimensions 10.2 × 7.9 × 0.5 in
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Big Bertha: How a Massive Tunnel Boring Machine Dug a Highway Under Seattle”

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

SHARE

Description

This incredible story about Bertha, the massive tunnel boring machine that successfully constructed the longest and widest road tunnel in the contiguous United States, under the city of Seattle, brought to life in vibrant and engaging illustrations, will appeal to kids ages 7-10 fascinated with big machines and how they work.

In 2013, construction crews raced to replace a crumbling elevated highway along Seattle’s waterfront with a double-decker tunnel running almost two miles under the city. This is the story of Bertha, the mammoth and complex tunnel boring machine that simultaneously dug and built the tunnel, and Deputy Project Manager Greg Hauser and his dedicated crew.

Kids interested in engineering and how machines function will love learning about the tunnel boring machine, how it worked, and how Bertha’s crew solved problems that arose along the way to ultimately construct an amazing, earthquake-safe highway under the city.

In addition to the narrative story the book includes additional information about Bertha and this fascinating engineering feat, including:

  • Facts about Bertha and the tunnel
  • How Bertha simultaneously dug and built a tunnel
  • Engineering background about the tunnel’s construction

Little Bigfoot

Big Bertha: How a Massive Tunnel Boring Machine Dug a Highway Under Seattle

$18.99

11 in stock

Refresh Stock Level
You might like:
SHOPPING BAG 0
RECENTLY VIEWED 0
RAB's Books
Added to wishlist! VIEW WISHLIST
Get exclusive updates and offers!
Get a 10% off code for signing up to our email list.
    SUBSCRIBE
    Verified by MonsterInsights